Texas Granite
No-wax solid vinyl tile with a 30-year life expectancy and over 40% less annual upkeep than waxed VCT
Get the slab right and the floor takes care of itself. Yorkshore does not install; that part is yours. What we can do is make sure the material, the prep system and the instructions land on site in a state your crew can work with, and that the build-up you are bonding to was specified by somebody who thought about the bond.
Every warranty on this card assumes a substrate brought to spec, which makes preparation the single biggest predictor of a floor that stays put. Get this part right and the rest of the job follows.
Confirming the slab has released is quick, inexpensive, and the single best thing you can do for a bond that is still sound months after you have demobilized.
Flatness is what lets a thin-gauge resilient floor read clean under raking light on day one and keep reading that way for the life of the floor.
Primer, patch, leveler, adhesive and finish floor all have to agree with each other. Keeping every layer inside one system is what keeps the warranty behind all of them.
Floor Prep sets out the whole package: what goes where, in what order, and what has to cure before the next thing lands on it.
Schönox for subfloor preparation. Sika for primers, patches and leveling compounds. Base King for adhesives and accessories, including EnviroSTIX. Because those sit on the same card as the finish floors, one person can confirm the whole stack is compatible, instead of three suppliers each vouching for their own layer and nobody owning the interface between them.
Installation instructions and maintenance charts are published openly on the product pages, per line, from the manufacturer, in their own document rather than paraphrased by a rep. Gauge, wear layer, format and test references are stated on the product page itself. Hand the maintenance documents over at closeout so the client's crew does not undo your work in year one.
Requests route by the project's county to the account executive who covers it, so a lead time you are quoted comes from somebody who knows the distributor rather than a national average. If a specified product will not land in time, the card is deep enough that an alternate at the same performance can usually be found and put in writing for the architect, instead of swapped on site.
Square footage is not the order. Diagonal lays, feature bands, small rooms and short runs all raise the offcut, and the difference shows up as a second delivery.
Manufacturers state the temperature and humidity a floor is conditioned and installed in. Those figures sit in the installation document, and a warranty leans on them.
Replacement material bought with the job matches. Bought two years later it is a different run, which is worth putting in front of the client while the order is still open.
Shade variation between cartons, transit damage, a short count: a quick look before anything goes down keeps a simple fix simple.
Finish floor, adhesive, leveling compound and accessories from a single source, and one person accountable for the fact that they work together.
Hard surface and soft surface on one card, with the preparation and adhesives underneath all of it.
No-wax solid vinyl tile with a 30-year life expectancy and over 40% less annual upkeep than waxed VCT
Red List Free rubber tile and sheet with Nfuse, tested to ASTM F1515 for color durability
30 mil wood- and stone-look luxury vinyl plank and tile for heavy commercial traffic
Heterogeneous sheet vinyl with a self-disinfecting wear layer for healthcare and commercial interiors
Cement-based rapid-drying smoothing compound, featheredge to 6 mm, ready for covering in about 20 minutes, EC1 PLUS R
Highly fluid cement-based self-leveling underlayment for new and renovated interior floors
Pre-applied adhesive with ES-MBP moisture barrier primer for slabs up to 100% RH, no pH limit, immediate access
Acrylic adhesive for VCT, SVT, LVT and plank, rated to 99% RH (92% under sheet goods) and pH 12
Samples
Physical samples ship for the products that hold your attention.
Documents
Specifications, installation and maintenance documents sit on every product page. Nothing is behind a form.
Account executive
Assigned on where the project is, from specification through closeout and the reorder two years later.
Share your project details and we’ll recommend suitable products, documents and samples.